§ 340-20. Design requirements; codes; sewer line extensions.
Latest version.
The size, slope, alignment, materials of construction of a building
sewer, and the methods to be used in excavating, placing of the pipe,
jointing, testing, and backfilling the trench, shall all conform to
the requirements of the building and plumbing codes or other applicable
rules and regulations of the City's adopted New Mexico standard
specifications for public works contracts. Any person requesting the extension of a City sewer main
shall be required to receive approval in advance of any such extension
from the Director and enter into a sewer line extension agreement
with the City.
var val = document.getElementById('citecontent').innerHTML;
art.dialog.defaults.title = window.location.href;
art.dialog.data('cite', val);
art.dialog.data('homeDemoPath', '/Scripts/plus/artDialog/');
art.dialog.open('/Scripts/plus/artDialog/citeiframe.html');